Skip to content

About CNC GROUP

Industrial buying should be easier to verify.

Our site is organized to make products, production evidence and inquiry requirements easier to review as separate decisions.

Orderly industrial machinery production hall

How the work is organized

Engineering, manufacturing, inspection and delivery stay visible as separate chapters.

01

Requirement review

Define the part, material, process and open technical questions.

02

Configuration scope

Separate the core machine, options, automation and site assumptions.

03

Evidence checkpoints

Identify which production and inspection records matter before approval.

04

Delivery planning

Clarify packing, destination, site readiness and follow-up information.

Quality control

Eight checkpoints keep the project reviewable.

The exact inspection scope still follows the selected machine, configuration and technical agreement.

  1. 01

    Requirement and design review

    Clarify the application, working environment, machine structure, electrical scope and control requirements.

  2. 02

    Incoming parts review

    Check the identified components and incoming records against the approved configuration.

  3. 03

    Parts processing

    Review critical dimensions, processing accuracy and the checkpoints defined for manufactured parts.

  4. 04

    Assembly

    Follow the defined assembly sequence and confirm the function of completed subassemblies.

  5. 05

    Performance testing

    Test the functions and performance indicators agreed for the selected equipment scope.

  6. 06

    Inspection and acceptance

    Review appearance, safety, electrical, mechanical and agreed acceptance evidence before shipment.

  7. 07

    Packing and transport

    Confirm the packing method, protected components, destination and handover requirements.

  8. 08

    Support and feedback

    Keep installation information and reported quality issues connected to the project record.

Buyer review

Review capability through project evidence.

Identity

Confirm the company and the people responsible for the project.

Capability

Review process capability against the intended application.

Inspection

Agree on acceptance evidence for the selected scope.

Delivery

Confirm the handover information required by the destination.

Project inquiry

Start with a requirement that can be reviewed.

Share the material, workpiece, production target and destination so the next conversation starts with useful context.

Start an inquiry